Constuction Schedule

Although the specific sequence of construction steps varies and overlaps, generally we build your home in the following order:

Foundation

  • Excavation
  • Footings
  • Form and pour walls
  • Perimeter drain
  • Waterproof
  • Insulation, if applicable
  • Inspection
  • Plumbing service/ground works
  • Inspection
  • Basement & concrete flatwork
  • Backfill/rough grade
  • Garage concrete flatwork

Framing

  • Load bearing walls
  • First floor
  • Second floor
  • Roof trusses
  • Roof sheathing
  • Basement & punch work

Roofing

  • Felt or paper
  • Valley flashing
  • Shingles
  • Windows installed & exterior doors

Exterior

Exterior trim

  • Fascia
  • Finish materials
  • Deck, if applicable

Exterior painting/staining

Driveway

Gutters

Landscaping

Interior

Rough-in of mechanical systems (after framing)

  • HVAC (heating, ventilating, and air conditioning)
  • Plumbing
  • Electrical
  • Rough inspections

Insulation

  • Drywall
  • Hang
  • Tape and texture

Interior trimwork

  • Doors
  • Baseboards, casings, other details
  • Cabinet Install

Paint and stain

Finish work

  • Light fixtures
  • Plumbing fixtures
  • Countertops
  • Tile
  • Floor coverings
  • Appliances
  • Hardware
  • Screens

Construction cleaning

Builder's punchlist

Homeowner orientation

Closing